  • Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
    23 hours ago
  • Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
    3 days ago
  • Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
    1 week ago
  • We are delighted to be taking part in the @mentalhealthworldcup in 2025. We will be team Belgium on the pitch at @officialqpr next May and looking forward to taking part in this great event #mentalhealth #charity #challange #BuildingaBetterFuture #FitOut
    2 weeks ago
  • In May 2024 Paragon’s Matt Phillips, Joe Doherty, Scott Maguire and Jonathan Smith completed the @ridelondon 100-mile bike ride through London and Essex for its two chosen charities: @thebraintumourcharity and @ylfcharity . The team raised approx. £5,000 for the chosen charities and are planning for next year’s big challenge. Thank you to everyone that donated to the worthy causes. 
#Charity #Donations #Challenge #BuildingaBetterFuture #FitOut
    3 weeks ago
  • Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
    4 weeks ago
  • We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
    10 months ago
  • A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️

Thanks to Joe McCann for organising and everyone who played!

#networking #business2business #fitout #refurbishment #construction
    11 months ago
  • Thank you to Designer Group for hosting a fun evening of 5 a-side football and drinks yesterday, we had a great time!

Our losing streak sadly continued with a close 15-12 at full time! ⚽️

Thank you to Nathan Nyante and Franklin Soteye for arranging.

#networking #fitout #construction #property
    11 months ago
  • COMING SOON! 📣 

We have been busy working on our brand-new website…which is launching TOMORROW!
 
Here is a sneak peak of what’s to come! Watch this space!
 
#fitout #websitedevelopment #newwebsite #growth #investment #comingsoon #sneakpeak
    1 year ago
  • A lovely sunny evening for a game of 5-a -side football with Core Five LLP 

An action packed 10 all draw and then a few well earned drinks afterwards! 

Thanks to both teams for taking part!

Benjamen Fenton 
Matthew Saunders MRICS 

#networking #b2b #fitout #london #property #refurbishment #construction  #loveconstruction #paragon
    1 year ago
  • Yesterday, members of our Paragon team attended the CoreNet Global UK Chapter Young Leaders Spring Social for a fun evening of networking!
 
Thanks to the organisers for hosting a great event!
 
#networking #nextgen #youngleaders #fitout #workplace #london #corenet
    1 year ago
  • Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
    3 years ago
  • £12m Project Win for Paragon 🏆 
 
We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. 

The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. 

A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk 

https://lnkd.in/efb-Fm7B 

#loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
    3 years ago
  • It’s never too late to learn something new. Take time out from all those stresses and worries in your daily life and do something for yourself. #selflove #mentalhealthawarenessweek2021 

Support our JustGiving page for Mind
 https://lnkd.in/dcUX__B
 
 #loveconstruction #fitout #mentalhealth #tilburydouglas #paragon
    3 years ago
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London

Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award.
The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life!
Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”.
See the link below to our full case study:
www.tdparagon.co.uk/project/framestore

Size: : 100,000 sq ft .

Durations: 30 weeks 

Client: Framestore

PM: @colliers.uk 

Quantity Surveyor: @baps_online 

Architect: @wearespacelab_ 

MEP Consultant: @cundall_global
Address: Framestore, Holborn, London Description of works: Paragon was appointed to fit out 100,000 sq ft of offices for our client, Framestore, a company known globally for their work across different areas of media including film, commercials, television and immersive entertainment. Their impressive visual effects portfolio includes the Disney’s Beauty & the Beast, Marvel’s Guardians of The Galaxy films and Blade Runner 2049, for which they won the academy award. The new, open plan design has allowed Framestore to relocate their five London offices into one grand headquarters which perfectly represents their vision and allows them to showcase what they do best, bringing extraordinary ideas to life! Framestore’s CEO and founder, Sir William Sargent explains that the decision to move has been in response to a change in their client’s needs and the demand “to deliver advanced, multi-disciplined projects that require all facets of our creative and technological services”. See the link below to our full case study: www.tdparagon.co.uk/project/framestore Size: : 100,000 sq ft . Durations: 30 weeks Client: Framestore PM: @colliers.uk Quantity Surveyor: @baps_online Architect: @wearespacelab_ MEP Consultant: @cundall_global
22 hours ago
View on Instagram |
1/15
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London

Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first.

See the link below for our full case study:
www.tdparagon.co.uk/project/asi-one/

Size: : 42,000 sq ft .

Durations: 55 weeks 

Client: ASI

PM: @3pm.uk 

Quantity Surveyor: @_exigere 

Architect: @m_w_architects 

MEP Consultant: @ramboll_uk
Address: ASI - One Welbeck Street, Marylebone, London Description of works: We delivered this exclusive 42,000 sq ft private medical facility in collaboration with Welbeck Health Partners creating the country’s largest private specialist facilities for diagnostics, therapies and minimally invasive surgery. The complex fit out and refurbishment scheme required extensive structural and services modifications to accommodate the state of the art specialist medical equipment including two new MRI scanners, one x-ray suite and a CT examination room. A new glazed extension and external terrace open up the Women’s healthcare facility. The tastefully design scheme features high end finishes and bespoke feature joinery throughout, helping to create a unique environment that puts patients first. See the link below for our full case study: www.tdparagon.co.uk/project/asi-one/ Size: : 42,000 sq ft . Durations: 55 weeks Client: ASI PM: @3pm.uk Quantity Surveyor: @_exigere Architect: @m_w_architects MEP Consultant: @ramboll_uk
3 days ago
View on Instagram |
2/15
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P

Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study:

www.tdparagon.co.uk/project/churchhouse

Client: The Corporation of the Church House

Project Manager: @currieandbrown 

Quantity Surveyor: @currieandbrown 

Architect: @scottwhitbystudio 

MEP Consultant: @webbyates
Address: Church House, SW1P Description of works: Paragon is currently on site undertaking the refurbishment and fit-out of Church House for The Corporation of the Church House (TCCH). The project has been procured via a two-stage process and we were initially engaged under a PCSA to carry out surveys and strip out works to existing office space whilst the design and price were developed. Paragon’s refurbishment of Church House for TCCH will provide over 45,000 sq ft of modern flexible office facilities for new and existing tenants, and elevate the existing cores, common areas, and entrances. Follow the link below for the full case study: www.tdparagon.co.uk/project/churchhouse Client: The Corporation of the Church House Project Manager: @currieandbrown Quantity Surveyor: @currieandbrown Architect: @scottwhitbystudio MEP Consultant: @webbyates
1 week ago
View on Instagram |
3/15
We are delighted to be taking part in the @mentalhealthworldcup in 2025. We will be team Belgium on the pitch at @officialqpr next May and looking forward to taking part in this great event #mentalhealth #charity #challange #BuildingaBetterFuture #FitOut
We are delighted to be taking part in the @mentalhealthworldcup in 2025. We will be team Belgium on the pitch at @officialqpr next May and looking forward to taking part in this great event #mentalhealth #charity #challange #BuildingaBetterFuture #FitOut
2 weeks ago
View on Instagram |
4/15
In May 2024 Paragon’s Matt Phillips, Joe Doherty, Scott Maguire and Jonathan Smith completed the @ridelondon 100-mile bike ride through London and Essex for its two chosen charities: @thebraintumourcharity and @ylfcharity . The team raised approx. £5,000 for the chosen charities and are planning for next year’s big challenge. Thank you to everyone that donated to the worthy causes. 
#Charity #Donations #Challenge #BuildingaBetterFuture #FitOut
In May 2024 Paragon’s Matt Phillips, Joe Doherty, Scott Maguire and Jonathan Smith completed the @ridelondon 100-mile bike ride through London and Essex for its two chosen charities: @thebraintumourcharity and @ylfcharity . The team raised approx. £5,000 for the chosen charities and are planning for next year’s big challenge. Thank you to everyone that donated to the worthy causes. #Charity #Donations #Challenge #BuildingaBetterFuture #FitOut
3 weeks ago
View on Instagram |
5/15
Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
Address: 3 Minster Court, London

Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior.

Floors completed: 2nd, 3rd and 5th floors

Durations: Approx. 6 weeks per floor

Client: Greycoat Real Estate LLP

Quantity Surveyor – @wtpartnership 

Architect: @bgyarchitects 

MEP Consultant: Waterman Building Services Ltd
Address: 3 Minster Court, London Description of works: CAT A demise splits completed for the landlord of the building to create separate office / smaller lettable areas. Fire barrier upgrades, MEP modifications and acoustic partitions installed for demise separation. Lift lobby and communal areas also refurbished to include new @havwoods hardwood flooring and glazed partitions and doors with access control. Negotiated with the client after completing a refurbishment of the entire building several years prior. Floors completed: 2nd, 3rd and 5th floors Durations: Approx. 6 weeks per floor Client: Greycoat Real Estate LLP Quantity Surveyor – @wtpartnership Architect: @bgyarchitects MEP Consultant: Waterman Building Services Ltd
4 weeks ago
View on Instagram |
6/15
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night!

Congrats to all the winners and thanks to our lovely guests for joining us!

#fitout #offices #networking #construction
We had a great evening at the @bco_uk #bcoawards last night! Congrats to all the winners and thanks to our lovely guests for joining us! #fitout #offices #networking #construction
10 months ago
View on Instagram |
7/15
A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️

Thanks to Joe McCann for organising and everyone who played!

#networking #business2business #fitout #refurbishment #construction
A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️

Thanks to Joe McCann for organising and everyone who played!

#networking #business2business #fitout #refurbishment #construction
A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️

Thanks to Joe McCann for organising and everyone who played!

#networking #business2business #fitout #refurbishment #construction
A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️

Thanks to Joe McCann for organising and everyone who played!

#networking #business2business #fitout #refurbishment #construction
A great evening with RLB yesterday and we are pleased to say our losing streak is finally over thanks to a 11-10 win!! 🙌🏼⚽️ Thanks to Joe McCann for organising and everyone who played! #networking #business2business #fitout #refurbishment #construction
11 months ago
View on Instagram |
8/15
Thank you to Designer Group for hosting a fun evening of 5 a-side football and drinks yesterday, we had a great time!

Our losing streak sadly continued with a close 15-12 at full time! ⚽️

Thank you to Nathan Nyante and Franklin Soteye for arranging.

#networking #fitout #construction #property
Thank you to Designer Group for hosting a fun evening of 5 a-side football and drinks yesterday, we had a great time! Our losing streak sadly continued with a close 15-12 at full time! ⚽️ Thank you to Nathan Nyante and Franklin Soteye for arranging. #networking #fitout #construction #property
11 months ago
View on Instagram |
9/15
COMING SOON! 📣 

We have been busy working on our brand-new website…which is launching TOMORROW!
 
Here is a sneak peak of what’s to come! Watch this space!
 
#fitout #websitedevelopment #newwebsite #growth #investment #comingsoon #sneakpeak
COMING SOON! 📣 

We have been busy working on our brand-new website…which is launching TOMORROW!
 
Here is a sneak peak of what’s to come! Watch this space!
 
#fitout #websitedevelopment #newwebsite #growth #investment #comingsoon #sneakpeak
COMING SOON! 📣 

We have been busy working on our brand-new website…which is launching TOMORROW!
 
Here is a sneak peak of what’s to come! Watch this space!
 
#fitout #websitedevelopment #newwebsite #growth #investment #comingsoon #sneakpeak
COMING SOON! 📣 We have been busy working on our brand-new website…which is launching TOMORROW!   Here is a sneak peak of what’s to come! Watch this space!   #fitout #websitedevelopment #newwebsite #growth #investment #comingsoon #sneakpeak
1 year ago
View on Instagram |
10/15
A lovely sunny evening for a game of 5-a -side football with Core Five LLP 

An action packed 10 all draw and then a few well earned drinks afterwards! 

Thanks to both teams for taking part!

Benjamen Fenton 
Matthew Saunders MRICS 

#networking #b2b #fitout #london #property #refurbishment #construction  #loveconstruction #paragon
A lovely sunny evening for a game of 5-a -side football with Core Five LLP 

An action packed 10 all draw and then a few well earned drinks afterwards! 

Thanks to both teams for taking part!

Benjamen Fenton 
Matthew Saunders MRICS 

#networking #b2b #fitout #london #property #refurbishment #construction  #loveconstruction #paragon
A lovely sunny evening for a game of 5-a -side football with Core Five LLP 

An action packed 10 all draw and then a few well earned drinks afterwards! 

Thanks to both teams for taking part!

Benjamen Fenton 
Matthew Saunders MRICS 

#networking #b2b #fitout #london #property #refurbishment #construction  #loveconstruction #paragon
A lovely sunny evening for a game of 5-a -side football with Core Five LLP 

An action packed 10 all draw and then a few well earned drinks afterwards! 

Thanks to both teams for taking part!

Benjamen Fenton 
Matthew Saunders MRICS 

#networking #b2b #fitout #london #property #refurbishment #construction  #loveconstruction #paragon
A lovely sunny evening for a game of 5-a -side football with Core Five LLP An action packed 10 all draw and then a few well earned drinks afterwards! Thanks to both teams for taking part! Benjamen Fenton Matthew Saunders MRICS #networking #b2b #fitout #london #property #refurbishment #construction #loveconstruction #paragon
1 year ago
View on Instagram |
11/15
Yesterday, members of our Paragon team attended the CoreNet Global UK Chapter Young Leaders Spring Social for a fun evening of networking!
 
Thanks to the organisers for hosting a great event!
 
#networking #nextgen #youngleaders #fitout #workplace #london #corenet
Yesterday, members of our Paragon team attended the CoreNet Global UK Chapter Young Leaders Spring Social for a fun evening of networking! Thanks to the organisers for hosting a great event! #networking #nextgen #youngleaders #fitout #workplace #london #corenet
1 year ago
View on Instagram |
12/15
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. 

Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. 

The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. 

It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. 

Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us!

#loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
Ending the week on a high, last Friday the project team at Kew Hostel along with consultants @macegroup took part in #GADOYT with the @thefelixproject Project in their East London kitchen. Paragon partnered with The Felix Project earlier this year, as part of our 'Give a Day of your Time' initiative, which encourages our staff to give a day back to charity. The Felix Project is a London based surplus food distribution charity set up in 2016 and they are on a mission to end hunger and food waste. It was a fun, challenging and rewarding day, filled with laughter. After 4 hours we managed to package over 1400+ meals, cut over 1000+ peppers and crack 700+eggs. Those meals will go to local communities, largely schools, charities and families within the area. Hopefully next time we can break the record for most meals packaged. Collaboration is key, not only on our projects but in everything we do, this goes to show what we can do if we all come together for something bigger than us! #loveconstruction #charitysupport #partnership #collaborate #tilburydouglas #felixproject #stophunger
3 years ago
View on Instagram |
13/15
£12m Project Win for Paragon 🏆 
 
We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. 

The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. 

A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk 

https://lnkd.in/efb-Fm7B 

#loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
£12m Project Win for Paragon 🏆 
 
We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. 

The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. 

A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk 

https://lnkd.in/efb-Fm7B 

#loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
£12m Project Win for Paragon 🏆 
 
We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. 

The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. 

A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk 

https://lnkd.in/efb-Fm7B 

#loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
£12m Project Win for Paragon 🏆 
 
We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. 

The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. 

A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk 

https://lnkd.in/efb-Fm7B 

#loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
£12m Project Win for Paragon 🏆 We are delighted to announce that we have secured another Design & Build scheme for a key public sector client. The £12m Cat B fit out represents the first phase of works to take place within a secure and occupied government building. The project is the culmination of many months of hard work developing the Stage 4 design in close collaboration with our client and their professional team. A big thank you to everyone involved, including the teams from Paragon, Tilbury Douglas Engineering, @hlmarchitects @hoare_lea and @wspuk https://lnkd.in/efb-Fm7B #loveconstruction #construction #fitout #wecan #collaborativeworking #tilburydouglas
3 years ago
View on Instagram |
14/15
It’s never too late to learn something new. Take time out from all those stresses and worries in your daily life and do something for yourself. #selflove #mentalhealthawarenessweek2021 

Support our JustGiving page for Mind
 https://lnkd.in/dcUX__B
 
 #loveconstruction #fitout #mentalhealth #tilburydouglas #paragon
It’s never too late to learn something new. Take time out from all those stresses and worries in your daily life and do something for yourself. #selflove #mentalhealthawarenessweek2021 Support our JustGiving page for Mind https://lnkd.in/dcUX__B #loveconstruction #fitout #mentalhealth #tilburydouglas #paragon
3 years ago
View on Instagram |
15/15

Get in touch

To find out how we can help you with your next fit out or refurbishment project, please call 0203 457 9800, or use the form below.

    Error: Contact form not found.